i)Labour schedule task
Follow the trade sequence below and complete the Labour Schedule table. You should:
1. List the roles required to undertake the work items in the table for constructing the King’s garage and workshop.
2. Identify the number of people required to fulfil each role and their responsibilities and skills needed.
3. Specify the timeframe during which the role will exist. Assume the project starts on the 1st April.
You have now collected all the information required to build a detailed resource schedule that calculates, records and tracks materials. A detailed resource schedule will enable Jai, the Site Supervisor, to identify the quantity of each type of resource needed on a daily, weekly and monthly basis. Complete tasks i) and ii) below:
i)Complete the Resource Schedule using the Excel Gantt chart below to:
calculate the quantities for the labour, materials/equipment
place the quantities in the appropriate column
show the scheduled times for the work to occur.
Building Regulations state that all necessary permit documents must be kept on-site. If an authority checks the site file and fails to find the necessary documents it has the right to stop all construction work on-site.
Go to the Build Right sample site file and go through the tabs to explore the typical documents contained in a site file.
Now complete the following tasks that relate to creating your own site file:
Create a list of site file documents that you would need to complete the garage and workshop for the King residence. Be sure to include any changes to the site file that might be needed for variations to plans, specifications and costs.